North Salem High School Bond Construction Photos
- Entry vestibule at the front main entrance.
- Entry vestibule at the front main entrance.
- A new classroom.
- A new classroom.
- New science lab.
- Renovated science lab.
- Added elevated walkway connecting the upstairs corridor of the new satellite commons to the existing building.
- Looking down the upstairs corridor above the new satellite commons.
- Woods Manufacturing CTE program space.
- Inside the classroom space for the Woods Manufacturing CTE program.
- Replacement weight room.
- Replacement weight room.
- Inside the replacement locker rooms.
- View of the new satellite commons and replacement gym (from the additional parking at the new west entrance), including CTE spaces for the Woods Manufacturing and Health Services programs, replacement weight room, replacement wrestling room and auxiliary gym.
- Entry courtyard to the new classroom wing, which includes 20 new classrooms, additional special education classrooms and the replacement athletic support spaces.
- Additional parking in the big parking lot off of D Street.
- New satellite commons.
- Secured vestibule at the new west entry.
- Administrative and athletic offices at the west entry.
- New general education classroom.
- Additional special education classrooms.
- Health Services career and technical (vocational) education program space.
- Woods Manufacturing career and technical (vocational) education program space.
- Woods Manufacturing CTE classroom space.
- Replacement wrestling room.
- Replacement main gym.
- Replacement auxiliary gym.
- Replacement weight room.
- Replacement weight room.
- Satellite commons and replacement main gym
- Elevated walkway connecting the new addition to the existing building
- Additional parking
- Additional parking
- New ticket booth
- New athletic storage
- Additional classrooms and athletic support spaces
- New classroom wing
- Two new classroom wings, including 20 new classrooms and athletic support spaces.
- Inside a new locker room
- New weight room
- Admin support space near the new west entry
- Woods Manufacturing Career and Technical Education classroom space
- Woods Manufacturing Career and Technical Education program space
- Corridor and hallway above the satellite commons
- New career and technical education program space for Health Services
- Inside the new wrestling room
- Replacement auxiliary gym
- Inside the replacement main gym
- Upstairs hallway connecting the two new classroom wings
- Looking down the hallway of a new classroom wing
- Inside a new classroom
- Entry courtyard of the new classroom wings
- A drone’s view of campus shows progress of new commons and gym additions. Photo credit: Pence Construction
- The two new classroom wings. Photo credit: Pence Construction
- The replacement gym is shown on the left, a new classroom wing on the right. Photo credit: Pence Construction
- Left: Covered walkway connects satellite commons (center) to existing building. Right: new replacement gym. Photo credit: Pence Construction
- A look inside the new mechanical and boiler room.
- The serving area in the new satellite commons is taking shape.
- The floor is poured upstairs in one of the new classroom wings.
- A view from inside the new gym, looking up to the auxiliary gym.
- The Fraco machine lifts masonry workers applying brick veneer.
- Windows have been added to the new athletic facility.
- Second floor where new classrooms will be added above the athletic support spaces. The construction crew is preparing to pour concrete.
- The construction crew has started adding brick to the new buildings.
- Inside the future wrestling room
- Upstairs hallway above the satellite commons, leading to the existing building via an elevated walkway.
- Inside the future career and technical (vocational) education woods manufacturing classroom.
- Inside the future career and technical (vocational) education woods manufacturing classroom.
- Inside the future athletic offices
- Inside the future weight room
- Downstairs in the new classroom wing
- New classroom wing, including 20 new general classrooms
- Athletic support building
- Athletic support building
- New athletic facility
- Workers are laying brick for the new building to match the look of the existing building.
- New satellite commons
- Satellite commons and athletic facility
- The interior of the satellite commons from the second floor.
- Inside the future athletic offices.
- The replacement weight room space.
- The roof is in progress on the new gym.
- A view of progress on the athletic spaces wing of the new addition.
- The classroom wing of the new addition taking shape.
- Classroom space inside the expanded woods program space (vocational ed.)
- Workers prep the walls of the satellite commons.
- A view of a stairwell from the floor of the satellite commons up to the second floor.
- Windows in the satellite commons space.
- Windows of the satellite commons space.
- The exterior is prepped for the installation of brick veneer.
- The new project information sign at North shares the overall plan for bond improvements at the school
- First coats of paint are being applied to the satellite commons and gym
- First coats of paint are being applied to the satellite commons and gym
- A view of the east side of the new classroom wing
- Roofing work on the new athletic support space and classroom addition
- Looking out the windows of a new classroom to the athletic support spaces on the other side
- Inside the new classroom wing where 20 general classrooms will be added
- New classroom wing, including 20 general classrooms
- New athletic support spaces
- New classroom wing, including 20 general classrooms
- Inside one of the athletic support spaces
- View of the stairs leading from the satellite commons to the upstairs hallway
- Upstairs hallway, just outside the wrestling room and career and technical education space
- View of the entrance to the new classroom wing. The section on the left includes athletic support spaces, and the section on the right includes the new classrooms.
- Classroom addition
- Classroom addition
- New main gym
- New main gym and weight room
- New main gym and weight room
- New career and technical (vocational) education space
- New wrestling room
- View of the new satellite commons from the upstairs hallway
- New satellite commons
- The building on the left includes the new satellite commons, career and technical (vocational) education spaces and a wrestling room. The building on the right includes the new main gym and weight room.
- More work on the elevated walkway connecting the hallway of the new building to the existing building
- The walls of the classroom addition are taller.
- Decking work on the roof of the new main gym
- More work on the satellite commons
- Walls are higher for the classroom addition
- Walls are higher for the classroom addition
- Windows of the athletic support spaces
- Walls are higher for the athletic support spaces
- Preparing the roof of the new main gym for decking work, which includes covering the roof with metal sheeting
- Fire-proofing the career and technical (vocational) education spaces
- Work on the interior walls of the satellite commons
- Walls are going up and work is being done to prepare for construction of the classroom addition.
- Walls are going up for the classroom addition
- Walls are going up for the locker rooms and athletic support spaces
- Framework for roofing of the new main gym
- More work done on the elevated walkway
- Inside the satellite commons
- New satellite commons and main gym
- Framework of the elevated walkway that will connect the hallways of the new addition and the existing building
- View of construction of the new main gym, athletic support spaces and classrooms
- Replacement athletic storage
- Inside the new main gym
- Inside the new main gym
- New satellite commons and main gym
- Concrete is being poured for the floor of the new satellite commons.
- Concrete is being poured for the floor of the new satellite commons.
- Aerial view of construction at North Salem High School
- Aerial view of construction at North Salem High School
- View of the new satellite commons.
- Construction of the new main gym
- Second floor wrestling room near the career and technical (vocational) education program spaces
- Construction of the new main gym
- View of the new addition, including new classrooms and athletic facility.
- View of the new addition where classrooms will be built
- New main gym
- The floor of the locker rooms is in the foreground, the south wall of the gym in the background. PC Orlando Alvarez
- The south wall of the gym is nearly half built. PC Orlando Alvarez
- The foundations of the new classroom wing are sealed against moisture. PC Orlando Alvarez
- View of the new addition, including new classrooms and athletic facility.
- Construction work happening on the new athletic facility, where the locker rooms, team rooms and training room will be.
- View of the new satellite commons.
- An excavator moves a large culvert cover.
- Concrete is being poured for the floors of the replacement athletic and training rooms.
- Concrete is being poured for the floors of the replacement athletic and training rooms.
- Photo taken facing west while standing inside the new main gym space.
- Progress on what will become the replacement weight room.
- Looking inside the new satellite commons space.
- The west wall of the new gym addition is growing taller.
- Looking toward the original building down what will become a hallway between the new gym and the new classroom addition.
- The southeast corner of the new classroom wing.
- The walls for the new classroom wing (bottom right of the photo) are starting to take shape.
- The view into the new gym space, facing toward the east.
- Looking down what will be the hallway in between the new gym (construction wall to the right) and new commons/CTE classroom space (on the left)
- Steel for the second floor in the new CTE space is being installed.
- Students walk past the construction zone from the temporary portable classrooms to the main school building during passing time.
- A peek inside the renovated science classroom on the first day of school.
- Ms. Such is all moved in to her new office on the second floor on the first day of school.
- Students in the new science classroom play an ice-breaker game on the first day of school.
- Students in the new science classroom play an ice-breaker game on the first day of school.
- Classroom furniture sits in the hallway at North Salem High School on Wednesday, August 28, 2019.
- New student teacher Heather Rayhorn unpacks books at North Salem High School on Wednesday, August 28, 2019.
- Math teacher Jacy Booren decorates a classroom at North Salem High School on Wednesday, August 28, 2019.
- Security improvements at the front entrance. PC Molly J. Smith
- Security improvements at the front entrance. PC Molly J. Smith
- Auditorium walls received seismic strengthening this summer, with more work planned for next summer. PC Molly J. Smith
- New cabinets and sinks installed in the brand new science lab. PC Molly J. Smith
- A new prep space between two science labs will support two classrooms. PC Molly J. Smith
- New cabinets and sinks installed in the brand new science lab. PC Molly J. Smith
- A new shared prep space between science labs. PC Molly J. Smith
- Renovations in an existing science lab added more natural light and space. PC Molly J. Smith
- Walls on the satellite commons and CTE addition are getting taller! PC Molly J. Smith
- Walls on the satellite commons and CTE addition are getting taller! PC Molly J. Smith
- The view from inside the new satellite commons looking out through large windows to the west. PC Molly J. Smith
- PC Molly J. Smith
- PC Molly J. Smith
- PC Molly J. Smith
- Some walls in the auditorium received seismic upgrades, with more work planned for next summer. PC Michael Arellano
- Improvements to the office will increase staff’s ability to control the front entry. PC Michael Arellano
- PC Michael Arellano
- PC Michael Arellano
- PC Michael Arellano
- PC Michael Arellano
- PC Michael Arellano
- PC Michael Arellano
- PC Michael Arellano
- PC Michael Arellano
- PC Michael Arellano
- PC Michael Arellano
- Walls are up in the discipline office upstairs. PC Molly J. Smith
- Front office renovations will create a safer, welcoming environment for campus visitors. PC Molly J. Smith
- Construction of the secured vestibule at the front entry. PC Molly J. Smith
- Renovations in the front office will create a safer, welcoming environment for school visitors. PC Molly J. Smith
- The rear entrance to the commons area is sealed up. PC Molly J. Smith
- Renovations in the science lab are taking shape. PC Molly J. Smith
- Site where a hallway from the new rear entry will tie in to the existing building. PC Molly J. Smith
- Roof work in progress on athletic storage and ticket/concession buildings. PC Mollly J. Smith
- Debris from demolition has been cleared. PC Molly J. Smith
- Former entrance to the main gym from inside the school. PC Molly J. Smith
- Another view of the installation of walls of the satellite commons and kitchen. PC Molly J. Smith
- Inside the old courtyard where a new boiler room will be constructed. PC Molly J. Smith
- Masons work on a movable platform to install walls of the satellite commons and kitchen. PC Molly J. Smith
- Masons work on a movable platform to install walls of the satellite commons and kitchen. PC Molly J. Smith
- Groundwork in the new CTE and satellite commons spaces.
- Renovation in an existing science lab includes adding a new prep space. Framework for the walls of the prep room are in place.
- Clean-up continues of the demolition site.
- Plumbing work in the new satellite commons and CTE space.
- Heavy equipment cleans up debris from demolition of the athletic facilities.
- Exterior gym walls are down and crane is in place to remove the beams.
- Replacement storage is taking shape.
- Scrap from demolition at North Salem.
- Exterior walls of the old gym have been removed.
- Exterior gym walls are down and crane is in place to remove the beams.
- Contractors build a mini-model of materials, joins, windows and angles to test the plans before building large-scale.
- Cabinetry being saved to be used again where needed.
- Interior preparations for a renovated science lab. Much of the original cabinetry and mouldings will remain.
- Seismic work inside the auditorium walls.
- Interior of a science room preparing for remodel to include a new prep space.
- Demo of the west wall of the old main gym.
- Demo of the west wall of the old main gym.
- Demo of the west wall of the old main gym.
- Four pieces of heavy equipment work together to demolish, sort and remove debris .
- Footings in place for the new satellite commons and kitchen.
- Concrete footings in place at the site of the new CTE space.
- The east entrance of the old gym provides a ramp for heavy equipment.
- Progress on removal of the old cinder-brick constructed auxiliary gym.
- Progress on the athletic storage building.
- The new concession and restrooms building is taking shape.
- View of the site of the new satellite commons, kitchen and demolition of the old boiler.
- Demolition of the old boiler.
- Demolition of the old boiler.
- Concrete pumper preparing the footings for the new satellite commons and kitchen.
- Concrete pumper preparing the footings for the new satellite commons and kitchen.
- Demolition of the concession area and auxiliary gym.
- Demolition of the auxiliary gym.
- Demolition of the old weight room.
- Demolition of the old weight room.
- Removal of old, worn-out portables prior to the start of construction.
- Trenches being prepared for plumbing at the site of the new satellite commons and kitchen.
- Preparing a portion of the parking lot for construction offices and materials.
- Dignitaries at the North Salem groundbreaking event, March 2019.
- Preparing the ground at the site of temporary portable classrooms. Classes will be held in the portables while portions of the building are under construction.
- Plumbing work at the site of the new concession building.
- A portion of the parking lot demolished to accommodate a satellite commons, kitchen and CTE space.
- Demolition of the old cinder block weight room.
- An aerial view of the old weight room, auxiliary gym and main gym.
- Aerial view of a portion of the old parking lot, demolished to make way for a satellite commons, kitchen and CTE space.
- Demolition of the old cinder block weight room.
- Demolition of the old cinder block weight room.
- Demolition of portions of the building started in May to make room for additional classrooms.
- ASB President Kiara Ballard talks about what the improvements mean for students.
- North Salem Principal Sara Leroy at the construction kick-off event.
- CBOC Co-chair Mark Shipman speaks at North’s groundbreaking event.
- Superintendent Perry speaks at North’s groundbreaking event.
- JROTC Cadets at North’s groundbreaking event.
- Golden shovels at North’s groundbreaking event.
- Auxiliary gym under demolition, June 2019
- Dignitaries at North Salem’s groundbreaking event.
- North Salem groundbreaking event invitation