- A look at the finished north classroom addition, which includes 14 new classrooms, one new science lab, expanded automotive, graphic design, and construction and geometry CTE spaces, and additional special education classrooms.
- Looking out to the courtyard between the new and existing buildings from the hallway of the north classroom addition.
- New entry courtyard at the main entrance of the school.
- New secured vestibule at the front entrance to enhance office staff’s ability to monitor and control who enters the school.
- Inside a new classroom.
- Diesel shop
- Diesel shop classroom
- Music room in the south addition.
- Music room in the south addition.
- Media production program space
- Additional parking, including new drop-off routes.
- Replacement weight room
- Inside the new music space. Photo credit: Pence Construction
- A view into a new classroom in the north wing. Photo credit: Pence Construction
- Looking toward the site of the replacement varsity softball field from the NE corner of the new classroom wing. Photo credit: Pence Construction
- Inside a classroom in the new wing. Photo credit: Pence Construction
- Lots of new lockers in the new classroom wing. Photo credit: Pence Construction
- Replacement weight room. Photo credit: Pence Construction
- The exterior of the new classroom wing built to the north of the existing building. Photo credit: Pence Construction
- Expansions include additional bathrooms. Photo credit: Pence Construction
- The ceiling and lights in the main gym have been improved. Photo credit: Pence Construction
- The new parking lot is being surfaced. Photo credit: Pence Construction
- Progress inside the new classroom wing.
- A view of the north classroom addition.
- Temporary portable classrooms are being removed so work can start on the bus lane and new parking lot.
- New curb improvements in the parking lot.
- Ceiling and lighting improvements in they gym. PC: Pence Construction
- PC: Pence Construction
- Seismic strengthening work continues inside McNary this summer. PC: Pence Construction
- Interior work including seismic strengthening and select classroom renovations continue this summer. PC: Pence Construction
- Interior work including seismic strengthening and select classroom renovations continue this summer. PC: Pence Construction
- Interior work including seismic strengthening and select classroom renovations continue this summer. PC: Pence Construction
- The new approach to the front entrance of the school. PC: Pence Construction
- The courtyard between the existing building and the north addition. Photo Credit: Pence Construction
- Ceiling tiles are being replaced in the gym. Photo Credit: Pence Construction
- Constructing the second floor hallway in the north addition. Photo Credit: Pence Construction
- The new school office wing and music support spaces seen from the SW corner. Photo Credit: Pence Construction
- Inside the new school office wing. Photo Credit: Pence Construction
- The interior of the new school office is looking good! Photo Credit: Pence Construction
- The north addition seen from the NE corner. Photo Credit: Pence Construction
- Softball field
- Upstairs in the north classroom addition.
- Inside the north classroom addition, which will include 14 classrooms, one new science lab, expanded career and technical (vocational) education spaces for automotive, culinary and residential construction program spaces and more.
- Inside the music room in the south addition
- Inside the admin office space of the south addition
- Roof supports are in place on the north addition.
- Brick veneer on the south addition.
- Hallway from the existing building into the new north addition.
- Inside the new courtyard between the north addition and existing building.
- Roofing work has started on the north addition.
- Inside the office spaces in the south addition
- Inside the digital media space in the south addition
- Inside the music room in the south addition
- Brick has been added to the exterior of the south addition.
- Brick is being applied to the exterior of the south addition.
- The grass is always greener on replacement softball fields!
- The foundation of an athletic storage shed that will be constructed by McNary students.
- A view from inside the new courtyard in the north classroom addition.
- Looking toward the existing building from inside the new, two-story classroom addition being built on the north side of school.
- The exterior of the new north classroom addition is being prepared for sealing
- A look at progress inside the new media production and music spaces in the south addition.
- This will be a new route for buses during pick up and drop off
- Inside the north addition
- Walls are up around the north addition
- Inside the south addition
- Brick has been added to the south addition
- A huge crane lifts wall panels in to place on the north addition.
- Walls are going up quickly on the north addition.
- A huge crane lifts wall panels in to place on the north addition.
- Work on the south addition
- Work on the south addition
- More progress on the north addition at McNary
- More progress on the north addition at McNary
- More work on the north addition
- Preparing the north addition for more concrete pouring
- Structure work for the secured vestibule at the front entrance
- More construction and site work for the south addition
- Inside view of the south addition
- Inside view of the south addition
- Inside view of the south addition
- Walls are up on the south addition
- The new bus exit route is being construction next to the new softball field.
- Floors are poured for the north addition and frames are being constructed for the wall panels.
- Floors are poured for the north addition and frames are being constructed for the wall panels.
- Floors are poured for the north addition and frames are being constructed for the wall panels.
- Aerial view of the campus showing additions on the north (left) and south (right) of the main building, and softball field installation to the east (top of frame).
- The south addition at the front entrance is making great progress!
- Floors are poured for the north addition and frames are being constructed for the wall panels.
- Turf is down on the replacement softball fields.
- Concrete is being poured for the floors in the north classroom addition.
- Concrete is being poured for the floors in the north classroom addition.
- Smoothing the walls of the new south addition.
- Roof work begins on the new south addition.
- Roof work begins on the new south addition.
- The south addition will feature a secured entry, relocated front office, music and media production space and more.
- Construction of the new south addition to increase safety and security at McNary
- Construction of the new south addition to increase safety and security at McNary
- Inside view of construction of the new south addition
- Construction of the new south addition to increase safety and security at McNary
- Inside view of construction of the new south addition
- Site prep for construction of the new addition
- Site prep for construction of the new addition
- Construction of the new exit routes for buses during pick up and drop off
- Construction of the new exit routes for buses during pick up and drop off
- Construction of the new south addition meant lifting concrete walls to build the structure!
- Construction of the new south addition meant lifting concrete walls to build the structure!
- Construction of the new south addition meant lifting concrete walls to build the structure!
- Prepping the site for construction of the new north addition, which includes 14 classrooms, one new science lab, expanded career technical (vocational) education spaces for automotive, culinary and residential construction program spaces and more.
- Concrete walls of the new south addition are going up.
- Prep work happening on site for construction of McNary’s new addition.
- Prep work happening on site for construction of McNary’s new addition.
- Construction of the new south addition
- Seismic improvements to make the building safer in case of an earthquake
- Construction of the new south addition
- Relocated tennis courts
- Students attend class on the first day of school in the temporary portable classrooms.
- The entrance to a future hallway that will connect to the new classroom wing under construction is boarded up with plywood on the first day of school.
- The entrance to a future hallway that will connect to the new classroom wing under construction is boarded up with plywood on the first day of school.
- The renovated concession stand window is open on the first day of school.
- The new windows in the cafeteria provide lots of natural light.
- Mr. Bartholomew’s remodeled science classroom holds new 9th grade students on the first day of school.
- A stairway offers a view of the progress of the expansion at the south entrance.
- A classroom with a view of construction waits for students to arrive on the first day of school for Freshmen students.
- A classroom with a view of construction waits for students to arrive on the first day of school for Freshmen students.
- Science teacher Dylan Bartholomew sets up his classroom in a renovated science lab at McNary High School on Wednesday, August 28, 2019. PC Molly J. Smith
- Science teacher Dylan Bartholomew sets up his classroom in a renovated science lab at McNary High School on Wednesday, August 28, 2019. PC Molly J. Smith
- Social studies teacher Ryan Kirch moves into a different classroom at McNary High School on Wednesday, August 28, 2019. PC Molly J. Smith
- Work on the north side of the campus where the classroom addition will be built. PC Molly J. Smith
- A concrete pumper works on the foundations for the expansion at the front entrance. PC Molly J. Smith
- This space will eventually be a hallway connecting to the new classroom addition. PC Molly J. Smith
- In the upstairs auxiliary gym. PC Molly J. Smith
- The new seismically strengthened gym wall with a fresh coat of paint.
- Finish work underway in a renovated science classroom. PC Molly J. Smith
- Finish work underway in a renovated science classroom. PC Molly J. Smith
- This space will eventually be a hallway connecting to the new classroom addition. PC Molly J. Smith
- PC Molly J. Smith
- PC Molly J. Smith
- The student store is getting ready for business soon. PC Molly J. Smith
- The student store is getting ready for business soon. PC Molly J. Smith
- Improvements to the cafeteria and kitchen. PC Molly J. Smith
- Crews work on landscaping in preparation for school to start. PC Molly J. Smith
- PC Molly J. Smith
- The replacement tennis courts take shape on the south end of campus. PC Michael Arellano
- Renovation of a science classroom in progress. PC Michael Arellano PC Michael Arellano
- Renovation of a science classroom in progress. PC Michael Arellano
- Cafeteria improvements include new windows and seismic strengthening to select walls. PC Michael Arellano
- Cafeteria improvements include new windows and seismic strengthening to select walls. PC Michael Arellano
- Cafeteria improvements include new windows and seismic strengthening to select walls. PC Michael Arellano
- PC Michael Arellano
- The interior of the south wall of the gym seen from the hallway. PC Michael Arellano
- The new, seismically safer south wall of the gym is almost complete. PC Michael Arellano
- The new, seismically safer south wall of the gym is almost complete. PC Michael Arellano
- Order is returning to the gym following seismic improvements over the summer. PC Michael Arellano
- The location of the classroom addition on the north side of the building. PC Michael Arellano
- The location of the classroom addition on the north side of the building. PC Michael Arellano
- Renovations in an upstairs science classroom.
- Renovated classroom spaces on the second floor make room for a new hallway to connect to the future classroom addition. PC Molly J. Smith
- New windows are being installed in the cafeteria. PC Molly J. Smith
- Renovations in an upstairs science classroom.
- Seismically strengthened walls have been installed behind the bleachers. PC Molly J. Smith
- The south wall is draped in preparation for new concrete walls to be installed. PC Molly J. Smith
- Renovations inside a science classroom. PC Molly J. Smith
- Temporary portable classrooms and the paved walkway to the main school building. PC Molly J. Smith
- New walls inside the student store. PC Molly J. Smith
- Work on a new wall by the stairway to the upper gym. PC Molly J. Smith
- Improvements to the kitchen and cafeteria in progress.
- The gym floors and bleachers have been well protected during construction. PC Molly J. Smith
- The tennis courts and shop area have been demolished to make room for the new classroom addition. PC Molly J. Smith
- Looking north from the main building to where the shop and tennis courts were. PC Molly J. Smith
- Forms for the foundation of the new south entry and expansion. PC Molly J. Smith
- Culinary classroom renovations, August 2019. PC Molly J. Smith
- Looking toward the east, just next to the auto shop, to where the old shop area was.
- Progress on changes at the front of the school, August 2019.
- South wall of the gym getting ready for concrete.
- The gym as seen from the second floor.
- Work in the gym hallway.
- Interior of the student store is receiving seismically stronger walls.
- The replacement tennis courts are taking shape near the Chemawa Road entrance.
- This framework will hold concrete that will form the new, seismically stronger wall at the south end of the gym.
- Forms being constructed for the foundation of the south addition that will include the secured vestibule at the front entrance.
- New pedestrian pathway from the temporary portable classrooms and student parking lot to the main building.
- Workers make progress on renovations to the front entry.
- Forms being constructed for the foundation of the south addition that will include the secured vestibule at the front entrance.
- Demolition continues on the old shop wing.
- Demolition continues on the old shop wing.
- Demolition continues on the old shop wing.
- Demolition continues on the old shop wing.
- Demolition continues on the old shop wing.
- Demolition continues on the old shop wing.
- Demolition continues on the old shop wing.
- Demolition continues on the old shop wing.
- Demolition continues on the old shop wing.
- Demolition continues on the old shop wing.
- Demolition continues on the old shop wing.
- Demolition continues on the old shop wing.
- Demolition continues on the old shop wing.
- The first pieces of the shop wing being demolished. Fourteen new classrooms will be built at the north end of the school.
- The first pieces of the shop wing being demolished. Fourteen new classrooms will be built at the north end of the school.
- The new entry addition is being outlined outside the south entrance of the school.
- The south entrance of the school looks a lot different!
- The south end of the gym is now fully removed.
- Excavating for seismic strengthening work in the gym.
- Excavating for new shear wall footings.
- Excavating for new shear wall footings.
- The south gym wall has been removed and will be replaced with a seismically stronger wall.
- Classroom being converted to a hallway that will lead to the new classroom wing.
- Second floor science.
- Work continues in front of the school. July 3, 2019.
- Areas slated for demolition are marked in preparation for construction work.
- Demolition at the front of the school to prepare for construction of secured vestibule.
- Areas slated for demolition are marked in preparation for construction work.
- Fencing around tennis courts removed in prep for construction.
- Ceilings removed in the northwest portion of the building in preparation for demolition.
- Construction in the concession stand area.
- Bleachers in the gym were removed from the walls and the gym floor covered.
- Spaces inside the school to receive construction were packed and moved.
- Demolition at the front of the school to prepare for construction of secured vestibule.
- Demolition of gym south wall, which will be rebuilt to a higher seismic standard.
- Demolition of south wall of the gym, which will be rebuilt to a higher seismic standard.
- Site prep for temporary portable classrooms and gravel parking lot on south athletic fields.
- Site prep for temporary portable classrooms and gravel parking lot on south athletic fields.
- Site preparation of construction staging area at McNary High School.
- Principal Jespersen and students Griffen Hubbard and Mariah Benitez break ground.
- McNary Principal Erik Jespersen, Keizer Mayor Cathy Clark and School Board Director Chuck Lee.
- McNary High School Principal Erik Jespersen talks about the improvements for the school.
- Lee Zumwalt of Pence Construction addresses the crowd at McNary’s groundbreaking event.
- Father Gary Zerr of St. Edward Catholic Church speaks at McNary’s groundbreaking event.
- Air Force JROTC Cadets present the colors.
- CTEC customized the golden shovels for McNary’s groundbreaking event.
- Air Force JROTC Cadets present the colors.
- McNary Groundbreaking Invitation