McKay High School Bond Construction Photos
- New library-media center and plaza just outside the entry.
- Inside the new library-media center.
- Looking down into the new library-media center from the upstairs hallway of the new science lab wing.
- Inside a new science lab.
- A fume hood inside a new science lab.
- Inside the new auxiliary gym.
- Inside the new weight room, which is connected to the new auxiliary gym.
- Inside the new weight room, which is connected to the new auxiliary gym.
- Inside the expanded career and technical education program space for culinary.
- Inside the expanded career and technical education program space for culinary.
- Inside the new career and technical education program space for agriculture.
- Inside the expanded career and technical education program space for engineering.
- New choir room.
- Inside one of the new DLC classroom spaces.
- The old library was renovated into a commons expansion.
- Commons expansion.
- New science lab and classroom wing, including the new library media center.
- Inside the new library media center.
- Inside a new science lab.
- Looking down the hallway inside the new science lab and classroom wing.
- Inside the relocated weight room.
- New auxiliary gym.
- New CTE building.
- Inside the new culinary CTE program space.
- Inside the new agriculture CTE program space.
- New music and DLC classroom wing.
- New choir room.
- New black box theater.
- A new DLC classroom.
- Commons expansion.
- New classroom wing, including new science labs, general education classrooms and a new library media center.
- A new science lab.
- Looking down the hallway inside the new classroom and science lab wing.
- In the new library media center.
- New CTE building.
- Culinary CTE program space.
- Culinary CTE program space.
- Engineering CTE program space.
- Agriculture CTE program space.
- Converting the existing library into a commons expansion.
- Expanding the commons to increase space for students during lunchtime.
- Front of the new library media center.
- New science lab and classroom wing.
- New science lab and classroom wing.
- Inside the new library media center.
- New auxiliary gym.
- Inside the new weightroom.
- New makeup room for performing arts.
- New tennis courts.
- Inside a new rehearsal space.
- The new CTE program building.
- The new CTE program building.
- Inside the new choir room.
- Looking down the hallway outside the new DLC classrooms and music spaces.
- A new DLC classroom.
- New classroom and science lab wing.
- New classroom and science lab wing.
- Inside a new science lab.
- Looking down into the new library media center.
- Inside the new library media center.
- New auxiliary gym.
- New special education and music wing.
- Inside a new DLC classroom.
- In the new black box theater.
- In the new choir room.
- Culinary CTE space.
- Agriculture CTE space.
- Engineering CTE space.
- Expanding the commons.
- New classroom wing.
- New classroom wing.
- Inside a new science lab.
- Inside a new classroom.
- View into the new library media center from the second level.
- New CTE building.
- CTE program space for Culinary.
- CTE program space for Agriculture.
- CTE program space for Engineering.
- New black box theater.
- New DLC classroom.
- New auxiliary gym.
- New library media center and classroom addition.
- New classroom wing.
- Inside a new classroom.
- Inside the new library media center.
- Looking down the hallway outside the new library media center, new auxiliary gym, relocated weight room and new classrooms and science labs.
- Inside the relocated weight room.
- New career and technical (vocational) education building.
- Inside the new CTE building – Culinary program space.
- New CTE program space.
- Hallway outside the new music spaces and special education classrooms.
- Inside a new DLC classroom.
- In the new black box theater.
- In the new choir room.
- Progress on the commons expansion.
- Northeast classroom wing, including additional general education classrooms, science labs with shared prep spaces and a new, state-of-the-art library media center.
- Inside the library media center looking towards the new classrooms and science labs.
- Northeast classroom addition.
- Inside the new classroom and science lab spaces.
- Inside the new classroom and science lab spaces.
- Southwest music and DLC addition.
- Black box theater.
- Choir room.
- DLC classroom.
- DLC classroom.
- Looking down the hallway outside the new music spaces and DLC classrooms.
- New CTE building.
- New CTE building.
- Inside a new CTE classroom space.
- Inside a new CTE classroom space.
- New auxiliary gym.
- Inside the new auxiliary gym.
- New library media center and classroom addition.
- Inside the new library media center.
- Inside the new science classrooms.
- New SW addition, including the blackbox theater, choir room and special education support program spaces.
- Looking down the hallway outside the new blackbox theater, choir room and special education support spaces.
- Inside the new black box theater.
- Inside a new special education classroom.
- New CTE building.
- Inside the new CTE building.
- New auxiliary gym.
- Inside the new auxiliary gym.
- Inside the weight room next to the new auxiliary gym.
- Renovations to expand the commons.
- Renovations to expand the commons.
- Renovations to the commons area, including new servery spaces.
- More steel framing around the new CTE building.
- More steel framing around the new CTE building.
- More steel framing up for the northeast classroom addition.
- Preparing to pour more foundational concrete flooring in the new northeast classroom wing.
- Construction continues on the new classroom wing, library media center and new auxiliary gym.
- Construction continues on the new CTE building.
- New music addition.
- New music addition.
- Inside the new music addition.
- Inside the new music addition.
- Inside the new music addition.
- New auxiliary gym.
- A new, 21st century library media center will be built here.
- New classrooms and science labs will be built here.
- Looking at the new northeast classroom addition.
- The new southwest music addition.
- Inside the new southwest music addition.
- Steel structure beginning to form around the new career and technical (vocational) education (CTE) program spaces.
- New tennis courts.
- Walls are much taller now around the north classroom addition.
- Walls are much taller now around the north classroom addition.
- Workers continue to make good progress on the south music addition.
- Foundational concrete flooring is in place for the new career and technical (vocational) education program spaces.
- Work continues on the relocated tennis courts.
- The walls are going up around the north classroom addition.
- Walls are going up for the north classroom addition.
- Construction continues on the south addition.
- Inside the south addition, which will include music support spaces and additional DLC classrooms.
- Inside the south addition, which will include music support spaces and additional DLC classrooms.
- Work continues on the northeast classroom addition.
- Work continues on the northeast classroom addition.
- Work continues on the northeast classroom addition.
- Work continues on the northeast classroom addition.
- Renovations to the front entry to increase visibility of the main entry from the office.
- Renovations to the front entry to increase visibility of the main entry from the office.
- Renovations to the front entry to increase visibility of the main entry from the office.
- Walls are going up around the southwest addition.
- Walls are going up around the southwest addition.
- Preparing the footings for the new career and technical (vocational) education program spaces.
- Preparing the site for construction of the new classroom wing on the NE corner of the building.
- The front entrance will receive safety and security renovations.
- The front entrance will receive safety and security renovations.
- Renovations to the front office will increase visibility of the main entry.
- Walls are going up for the SW addition, which will include a new choir room, black box theater and two DLC classrooms.
- Walls are going up for the SW addition, which will include a new choir room, black box theater and two DLC classrooms.
- Looking south toward the NE corner of the school from the site of the new classroom wing
- Improvements are coming for the main school entrance.
- The front entrance will receive safety and security renovations.
- Major improvements for the front entry to the school.
- Footings for the new DLCs and black box theater at the SW corner of the school.
- Markings note where to excavate
- All the portables have been moved to make space for the new classroom wing.
- Site prep for the new classroom wing continues at McKay
- Site prep continues at McKay
- Surveying the site of the new classroom wing.
- Portables are being removed at the site of the new classroom wing.
- Prep work at the site of the new classroom and media center wing.
- The tennis courts have been removed.
- Footings being prepared for the southwest addition.
- A portable classroom is ready to be moved off site to make room for construction to begin in June
- Brick veneer from the SW corner of the school has been removed in prep for the construction of new choir room, black box theater and two DLCs
- Brick veneer in the process of removal
- The NW corner of the parking lot is changing to improve traffic flow
- The pad for the relocated tennis courts
- A worker removes brick veneer from the SW corner of the building
- Trees have been removed where the new choir room, black box theater and two DLCs will be built
- The site on the south side of the school is being readied for construction of the career-technical (vocational ed) building
- Improvements to traffic flow onto campus from Wolverine are underway
- Arbor vitae were removed to make room for the relocated tennis courts
- Temporary portable classrooms will be located at the western edge of campus during construction
- Grading work at the site of the replacement tennis courts