Keizer Elementary School Bond Construction Photos
- Paving the new front student pick-up and drop-off loop.
- Paving work on the new student pick-up and drop-off loop in front of the school.
- Forming the foundations for the new classrooms, cafeteria and multipurpose fitness room on the east side of the school.
- Renovations inside the library.
- The new check-in space at the front entry is taking shape.
- Renovations inside an existing classroom.
- A new cafeteria will be built here at the north end of the existing school building.
- A new cafeteria will be built here at the north end of the existing school building.