Auburn Elementary School Bond Construction Photos
- The main office and front entry was relocated to the east side of the building.
- The new front entry includes a secure and welcoming check-in space connected to the main office.
- The classroom addition includes 10 new classrooms and a new cafeteria, kitchen and servery.
- Inside the new cafeteria.
- Inside the new servery.
- Inside one of the new classrooms.
- Inside the new multipurpose fitness room.
- Additional covered play area.
- New classroom wing, including the cafeteria and kitchen.
- Inside a new classroom.
- Looking down the hallway inside the new classroom wing.
- Inside the new cafeteria.
- Under the new covered play area.
- In the new cafeteria.
- In the new cafeteria.
- A new classroom.
- Looking down the hallway in the new classroom wing.
- Expanding the library space.
- Expanding the library space.
- New classrooms, cafeteria and kitchen.
- New classroom wing.
- New classroom wing.
- Inside the new cafeteria.
- Inside a new classroom.
- Looking down the upstairs hallway in the new classroom wing.
- New classroom wing.
- New classroom wing.
- Looking down the upstairs hallway in the new classroom wing.
- Inside a new classroom with fresh paint.
- Windows installed and brick being added to the new classroom wing.
- Inside a new classroom.
- Looking down the upstairs hallway.
- Servery in the new kitchen.
- New multipurpose fitness room.
- New classroom wing, including the new cafeteria and kitchen.
- New classroom wing.
- Doorway into a new classroom.
- Inside a new classroom on the second floor.
- Looking down the hallway on the second floor of the new classroom wing.
- Exterior of the new cafeteria.
- New cafeteria.
- Inside the new servery/kitchen.
- Looking into the new cafeteria from the second floor of the new classroom wing.
- New classroom wing.
- Inside a new classroom.
- Looking down the hallway of the new classroom wing.
- New cafeteria.
- Inside the new cafeteria, facing the new classroom wing.
- Inside the new cafeteria, facing the new kitchen and servery.
- New multipurpose fitness room.
- Inside the new multipurpose fitness room.
- Inside the new multipurpose fitness room.
- New, two-story classroom wing.
- New, two-story classroom wing.
- Inside a new classroom.
- New cafeteria space between the new kitchen/servery and new classrooms.
- New kitchen and servery.
- Inside the new kitchen and servery.
- New multipurpose fitness room.
- New multipurpose fitness room.
- Inside the new, relocated front office.
- School sign at the new main entrance.
- New, two-story classroom wing, which will include ten new classrooms, a new cafeteria and a new kitchen.
- Inside the new classrooms.
- A view of the new kitchen and servery from the new cafeteria space.
- Inside the new kitchen and servery.
- New pick-up and drop-off loop, including additional parking.
- Wall wrap going around the new multipurpose fitness room.
- Inside the new multipurpose fitness room.
- Asphalt paving for the new pick-up and drop-off loop and additional parking.
- Asphalt paving for the new pick-up and drop-off loop and additional parking.
- Construction workers finished the brick veneer work on the new front entrance.
- New entry vestibule at the relocated front entrance.
- Walls are up around the new multipurpose fitness room.
- Inside the new multipurpose fitness room.
- Preparing the foundation for construction of the new, two-story classroom wing, which will include ten new classrooms and a new cafeteria.
- Relocated main entrance.
- Relocated main entrance.
- New secured vestibule at the relocated main entry.
- Construction work continues on the new multipurpose fitness room.
- Preparing the site for construction of the new drop-off and pick-up loop and additional parking.
- Preparing the site for construction of the new classroom wing, which will include 10 new classrooms and a new cafeteria and kitchen.
- A view of the relocated front office space and new main entry, including a new secured vestibule.
- The new multipurpose fitness room will be built here.
- Site improvements underway to include additional parking, improved traffic flow and a new covered play area.
- Site improvements underway to include additional parking, improved traffic flow and a new play area.
- Next summer, construction of the new classroom addition will begin in this location, which will include 10 new classrooms and a new cafeteria and kitchen.
- Relocated front office space to include a secured vestibule and increase visibility of the main entry.
- Relocated front office space to include a secured vestibule and increase visibility of the main entry.
- Relocated front office space
- The office will be relocated here and will include a secure check-in space.
- Auburn will receive improvements to traffic flow with a new drop-off loop and additional parking. A new multipurpose fitness room will also be construction on the east end of the school.
- The foundation is being prepared for the relocated office
- The school office will be relocated to this location near the gym
- The start of an improved traffic flow, parking and drive path to the east side of the school
- The office will be relocated here, and will include a secured check-in space
- Site work is underway at Auburn!
- A view of where renovations will extend the office toward the gym